USED OIL AND GAS DRILLS

Rig pic.jpg

2011 Schramm TXD 200

Rig was refurbished in January of 2019

  • New MTU engine (current HRS 3211)

  • New hydraulic pumps

  • Hydraulic system gone through

  • Rebuilt hydraulic cylinders

  • Replaced most hydraulic hoses

  • Hydraulic valve banks rebuilt

 

Contact for specs and more pictures.

Used Drill 1.png

2008 RD20-III

  • Sold new in 2013. Put into service in 2014.

  • Approximately 5,000 hours

  • 1250/350 air on board (less than 500 hours, always used auxiliary air)

  • Cummins QSX19 on deck

  • CAT C13 in carrier

  • 7 rod carousel

  • New Hydraulic Cooler

  • New power head

  • Around 6,000’ of drill pipe