COMPRESSORS, BOOSTERS, AND AIR END
BOOSTER REBUILD
-
Reman Caterpillar Engine
-
Rebuild Air End
-
New RJ Link Gearbox and Drive Coupling
-
Convert to Direct Drive
-
New Operation Panel
-
Replace PSI relief valves
-
Replace stage valves
-
Replace all hoses and wire harnesses
-
High Pressure Coolers retubed & tested
-
Recertify Bottles
-
Radiator and CAC sent out for testing
-
Sandblast all framework
-
Customer color match paint
![booster rebuild #8.jpg](https://static.wixstatic.com/media/fe8cef_b00c41ec0b4d4c45a41102fbdacbcce1~mv2_d_4032_3024_s_4_2.jpg/v1/fill/w_242,h_179,al_c,q_80,usm_0.66_1.00_0.01,enc_auto/booster%20rebuild%20%238.jpg)
![Booster Rebuild #3.jpg](https://static.wixstatic.com/media/fe8cef_ad080753b07a4df7aad14c7f6676bd1b~mv2.jpg/v1/fill/w_242,h_179,al_c,q_80,usm_0.66_1.00_0.01,enc_auto/Booster%20Rebuild%20%233.jpg)
COMPRESSOR REBUILD
-
Unit removed from skid and fully disassembled to bare frame
-
Frame sandblasted, primed and painted
-
Air-end housings magnetic particle inspected (magna-flux) for cracks
-
Remanufactured airend using replacement parts (rebuilt in-house)
-
New ASME Safety Relief Valve
-
New compressor oil thermostat and oil stop valve rebuilt
-
New drive coupling
-
Caterpillar factory remanufactured C18, Tier 3, ACERT engine installed
-
Rebuilt cooling fan drive assembly with extended lube connection
-
New engine radiator and cooling fan
-
Heat exchangers flushed and inspected
-
New literature pack provided (parts, O&M, engine & electronics manual)
-
Unit tested to same standards as new unit (test report provided with unit)
-
Rigorous pre-ship inspection
![IMG_2681.JPG](https://static.wixstatic.com/media/fe8cef_7417e0b20648436abb9ef7cc6a4db28b~mv2_d_3264_2448_s_4_2.jpg/v1/fill/w_382,h_284,al_c,q_80,usm_0.66_1.00_0.01,enc_auto/IMG_2681_JPG.jpg)
![IMG_2620.JPG](https://static.wixstatic.com/media/fe8cef_c6b01c89d5f74b24a0d60a7c3f9a62ce~mv2_d_3264_2448_s_4_2.jpg/v1/fill/w_95,h_71,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/IMG_2620_JPG.jpg)
Sullair Units
Enclosed Units
Portable Units
AIR END
-
Air End disassembled
-
Tolerances measured and checked
-
Parts cleaned and inspected
-
New drive coupling
-
Updates to parts made
-
Magnetic particle testing of housings
-
Replace all seals, gaskets,and o-rings
-
Assemble to factory specifications
-
Prime and paint
![IMG_2971.jpeg](https://static.wixstatic.com/media/fe8cef_4f80ea9b46534c9dad54c06aae7ae80b~mv2_d_2048_1536_s_2.jpeg/v1/fill/w_74,h_56,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/IMG_2971.jpeg)
![IMG_3054.jpeg](https://static.wixstatic.com/media/fe8cef_8c18744a8e194f07936059af62e974c3~mv2_d_2048_1536_s_2.jpeg/v1/fill/w_74,h_56,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/IMG_3054.jpeg)